Using Monoscope with Shape Up

Basecamp Shapeup 

Shape Up gives teams a clear rhythm for shaping and building meaningful product initiatives. Monoscope adds the analytical and strategic layer — connecting those initiatives to data, metrics, and learning loops.

Together they form a closed system: Shape → Initiative → Build → Measure → Decide → Learn.


Why Combine Shape Up and Monoscope

Shape Up focuses on how to choose and deliver work; Monoscope focuses on why that work matters and what it changes.

Shape Up FocusMonoscope AdditionResult
Six-week cycles with clear appetiteCycle Loops to track impact and learningA measurable feedback rhythm
Pitches and betting tableStructured Initiatives linked to metricsStrategic traceability
Hill charts and qualitative progressMetrics, forecasts, and Signal LoopsQuantitative insight
Cool-down reviewsRecorded decisions and learning eventsOrganisational memory

Shape Up keeps work disciplined; Monoscope makes it data-informed. You keep the rhythm — you gain visibility, evidence, and learning.


How It Works

1. Shape with Data

During the shaping phase, use a Monoscope Canvas to explore where leverage exists.

  • Analyse drivers and bottlenecks using Driver or Initiative Impact analyses.
  • Identify the key metric or relationship you aim to move.
  • Translate insights into pitches — which become Monoscope Initiatives.

The Monoscope Canvas becomes the analytical workspace that informs the Shape Up betting table.


2. Record Initiatives

Each approved pitch is created as a Initiative in Monoscope.

  • Add hypotheses, expected impact, and linked metrics.
  • Define appetite (timebox) and confidence level.
  • Connect the Initiative to goals or outcomes in the strategy graph.

This keeps each Shape Up project connected to measurable outcomes.


3. Start the Cycle

When a cycle begins, open a Cycle Loop in Monoscope for that plan.

  • The Cycle Loop documents which initiatives were chosen and why.
  • Inputs include key metrics, forecasts, and relevant insights from shaping.
  • This loop runs for the duration of the six-week cycle.

Cycle Loops are the Monoscope equivalent of Shape Up’s “cycle boundary.”


4. Monitor Signals During the Cycle

As teams build, Monoscope tracks real metrics.

  • If a metric drifts from its forecast, open a Signal Loop.
  • Discuss possible causes and document tactical decisions (pause, adjust, investigate).
  • Signal Loops stay lightweight — they keep feedback alive without interrupting delivery.

This adds evidence-based learning without micromanagement.


5. Review & Learn in Cool-Down

At the end of the cycle:

  • Close the Cycle Loop with results and learnings.
  • Record which metrics moved, what initiatives succeeded or failed, and what surprised you.
  • Update the strategy graph so future shaping sessions start from real evidence.

The cool-down review becomes a data-anchored retrospective, feeding the next shaping round.


6. Feed the Next Shape Up Round

Insights from completed loops guide new shaping:

  • Use metric variance and learnings to identify leverage points.
  • Re-run analyses on updated Monoscope Canvases.
  • Shape new pitches grounded in what was learned last cycle.

Example Flow

PhaseShape Up ConceptMonoscope FeatureOutput
ShapingPitch definitionMonoscope Canvas analysisData-informed pitches
BettingSelectionCycle Loop creationDocumented rationale
Build6-week executionActive Initiatives & Signal LoopsLive feedback
Cool-downReviewCycle Loop resolutionMeasured outcomes
Next CycleNew shapingUpdated Graph & MetricsLearning continuity

Best Practices

  • Keep Shape Up rituals intact. Monoscope adds context; it doesn’t add process overhead.
  • One Cycle Loop per Shape Up cycle. Use it as the single record for decisions and learnings.
  • Open Signal Loops sparingly. Focus on material changes in key metrics.
  • Tag Initiatives clearly. Use the same pitch names from Shape Up for traceability.
  • Use metrics as feedback, not scorecards. Numbers start conversations — they don’t end them.

Avoid turning Shape Up into a reporting process. Monoscope should enrich the cycle with insight — not add extra layers of approval.


Summary

By pairing Shape Up’s clarity of delivery with Monoscope’s clarity of impact, teams get both speed and learning.

  • Monoscope Canvases guide shaping with real data.
  • Initiatives tie work to measurable outcomes.
  • Cycle Loops record decisions and learning across cycles.
  • Signal Loops catch live deviations in performance.

Monoscope turns Shape Up from a rhythm of work into a rhythm of strategic learning — where every six-week cycle makes the next one smarter.